Service Facilities:

High Pressure:


• Installation of CNG Compressor System
• Installation of CNG Dispenser
• Fabrication and Installation of Cascade / Priority Panel / Filtration System
• Testing, commissioning and calibration of equipment

Low Pressure:

• Main pipe line, valve, fittings installation
• Blow down Vassal fabrication and installation.

 


Cooling System:

• Installation of cooling tower
• Installation of heat exchanger
• Fabrication and installation of water lines

 


Electrical System:

• Cabling
• Electrical Panel